9 Monitoring, Review and Implementation Comment

9.1 Introduction Comment

The Local Plan covers the period to 2044. During this time, changes in economic, social, environmental and legislative circumstances may affect the delivery of the Plan's vision, objectives and strategy. It is therefore important that the Plan is subject to effective monitoring and review to ensure that it remains relevant, effective and responsive to changing circumstances.

The Council will monitor the implementation of the Local Plan through a framework of objectives, targets and indicators set out in Table 9.1. The indicators have been selected to provide a proportionate assessment of whether the Plan's strategy is being delivered and whether its objectives are being achieved, rather than assessing individual polices. Monitoring will cover a range of topics including housing delivery, employment growth, town centre vitality, infrastructure provision, climate change, biodiversity, green infrastructure and the delivery of strategic site allocations.

9.2 Monitoring Comment

The Council will monitor the performance of the Local Plan on an ongoing basis and publish the results through an Authority Monitoring Report (AMR) at least annually. The AMR will assess progress against the monitoring framework, identify any significant changes in circumstances, and consider whether policies continue to perform effectively. Where monitoring identifies issues with the implementation of the Plan, the Council will consider whether intervention, further evidence gathering, policy updates or a review of the Plan is required.

The delivery of housing and maintenance of an adequate supply of development land are likely to be key indicators of whether the Plan's strategy is being successfully implemented. However, the Council will also monitor the performance of other strategic objectives and policies, including those relating to employment growth, town centres, climate change, biodiversity, green infrastructure, infrastructure delivery and environmental quality. Where monitoring identifies significant or sustained under-performance against key indicators, the Council will consider whether a review of the Plan, in whole or in part, may be necessary.

In particular, where the Housing Delivery Test indicates that housing delivery has fallen substantially below the housing requirement over the previous three-year period, or where the Council is unable to demonstrate an adequate housing land supply, the Council will investigate the causes of under-delivery and consider whether a review of the Local Plan is required. Similarly, significant changes in national planning policy, legislation, demographic trends, economic conditions or the evidence base may trigger a review where these changes would affect the effectiveness of the Plan or its consistency with national policy.

9.3 Strategic Site and Infrastructure Delivery Comment

Particular attention will be given to the delivery of strategic site allocations and key infrastructure identified within the Plan. The Council will work proactively with developers, infrastructure providers, statutory bodies, neighbouring authorities, landowners and other stakeholders to monitor progress, identify barriers to delivery and facilitate solutions where necessary. Monitoring will also consider the delivery of supporting infrastructure, environmental mitigation, biodiversity enhancements and other site-specific requirements.

9.4 Plan Review Comment

The Council is required to keep the Local Plan under review and assess whether its policies remain effective and up to date. In accordance with national policy and relevant legislation, the Council will undertake a review of the Plan at least once every five years from the date of adoption and determine whether an update, amendment or full review is necessary.

9.5 Implementation Comment

Partnership working between the Council, local communities, developers, infrastructure providers, statutory bodies, neighbouring authorities, landowners, businesses and other stakeholders. The Authority Monitoring Report will play an important role in assessing progress, identifying emerging challenges and opportunities, and informing decisions on whether further action is required to support the delivery of the Plan's vision and objectives.

The adoption-year AMR will establish a clear baseline for each indicator. Where a numeric target is not justified, monitoring will report the direction of travel and explain any material departure. A trigger will prompt investigation and corrective action; but will not automatically require a plan review.

Table 9.1: Monitoring Framework

Objective

Theme

Indicator

Target / desired direction

Principal source

Trigger for investigation or action

SO5

Housing delivery

Net additional dwellings completed each monitoring year

Average of at least 563 dwellings per annum over 2024-2044

Housing completions and AMR

Delivery below 85% of the requirement over a rolling three-year period

SO5 / SO8

Housing land supply

Years of deliverable housing land supply

Maintain at least five years’ supply plus the applicable buffer

Five-year housing land supply assessment

Unable to demonstrate the required supply

SO5

Housing Delivery Test

Published Housing Delivery Test result

At least 95%

Government publication

Result below 95%; formal review consideration if below 75%

SO5

Affordable housing

Affordable homes completed, by tenure, and percentage secured on qualifying schemes

Qualifying schemes meet Policy LC3 unless an evidenced variation is agreed

Permissions, completions and S106 monitoring

Sustained shortfall against policy expectations or repeated viability reductions

SO5

Housing mix and accessibility

Homes approved and completed by size, tenure, specialist housing and M4(2)/M4(3) standard

Qualifying schemes meet Policies LC2, LC5 and LC6

Development Management and Building Control records

Material or sustained non-compliance on qualifying developments

SO5

Self and custom build

Serviced plots permitted and completed compared with register demand

Sufficient permissions to meet evidenced demand; 5% on schemes of 100 or more homes

Self-build register and planning records

Permissions are insufficient to meet statutory demand

SO5

Traveller accommodation

Pitches permitted, completed and available against identified need

Maintain an adequate five-year supply and meet the identified plan-period requirement

GTAA, permissions and completions

Identified need or five-year supply is not met

SO1 / SO2

Employment land delivery

Net employment land and floorspace completed by use class, including allocated sites

Progress towards 20 ha general employment provision and delivery of allocated sites

Employment land monitoring

Sustained delivery materially below the expected trajectory

SO1 / SO2

Strategic logistics

Land and floorspace approved and completed at Land South of Markham Vale

Progress towards delivery of the 35 ha allocation

Planning and site monitoring

No substantive progress within five years of adoption

SO1 / SO2

Safeguarded employment areas

Employment land or floorspace lost to non-employment uses

No significant net loss that undermines the employment land portfolio

Planning permissions and completions

Sustained losses without compensating provision

SO3

Town centre health

Vacancy rate and diversity of uses in each defined centre

No sustained worsening from the adoption baseline

Town Centre Health Checks

Vacancy increases by more than 5 percentage points or worsens for three years

SO8 / SO14

Spatial distribution and brownfield land

Share of housing completions by settlement tier, strategic site and previously developed land

Broad alignment with Policy SS4 and the planned distribution of growth

Housing land monitoring and GIS

Significant sustained divergence that threatens the spatial strategy

SO8

Green Belt

Permissions granted, and appeals allowed, for inappropriate development in the Green Belt without the justification required by Policy SS12 and national policy

No decisions that materially undermine Green Belt purposes, openness or the Plan strategy

Planning decisions, appeal decisions and GIS monitoring

Any decision or appeal outcome that materially undermines the Green Belt or spatial strategy

SO8

Local Settlement Gaps

Permissions granted, and appeals allowed, for development that fails to maintain settlement separation, identity or the undeveloped character of a Local Settlement Gap

No development that materially undermines the function or integrity of a Local Settlement Gap

Planning decisions, appeal decisions and GIS monitoring

Any decision or appeal outcome resulting in material erosion of settlement separation or gap integrity

SO15

Strategic sites

Permissions, starts, completions and policy infrastructure milestones for Policies SS5-SS9

Delivery broadly in line with trajectories, masterplans and agreed phasing

Site delivery schedules and developer liaison

Output more than 25% below trajectory over five years or a critical milestone is missed

SO15

Infrastructure delivery

Status of critical and essential projects in the Infrastructure Delivery Plan

Delivery in step with development and agreed phasing

IDP and S106 monitoring; provider updates

Critical infrastructure is delayed so that planned growth cannot proceed

SO7

Climate change assessments

Qualifying applications accompanied by a proportionate climate change impact assessment

100% of qualifying approvals demonstrate compliance with Policy SS2

Planning application monitoring

Repeated approval without the required assessment or mitigation

SO7

Renewable and low-carbon energy

Renewable and low-carbon capacity approved and operational, by technology (MW)

Positive cumulative increase over the plan period

Planning permissions and completion notifications

No additional operational capacity over three consecutive years

SO11

Biodiversity net gain

Qualifying permissions securing BNG, percentage gain and on-site/off-site delivery

100% statutory compliance and at least the mandatory minimum net gain

Biodiversity gain plans, register and monitoring reports

Any material non-compliance or failure to secure long-term management

SO11

Trees and green infrastructure

Trees lost and replacement planting secured; green infrastructure delivered or enhanced

No unacceptable net loss; replacement planting and GI delivered as approved

Planning conditions, S106 and site monitoring

Repeated failure to implement approved planting or GI measures

SO12

Sustainable transport

Major developments with approved Travel Plans and walking, wheeling, cycling or public transport measures delivered

100% of qualifying schemes; measures delivered to agreed timescales

Transport assessments, Travel Plans and S106 monitoring

Repeated non-compliance or material backlog in delivery

SO7 / SO13

Flood risk and drainage

Permissions contrary to Environment Agency flood-risk advice; qualifying schemes delivering SuDS

Zero permissions contrary to sustained EA objection; SuDS delivered where feasible

Planning records, LLFA and EA consultation responses

Repeated permissions contrary to unresolved flood-risk objection.

SO10

Historic environment

Heritage assets at risk and permitted development causing harm or loss

Reduction in assets at risk and no avoidable loss of significance

Historic England and Council heritage records

Increase in assets at risk or repeated harmful outcomes

SO6 / SO11

Open space and recreation

On-site provision and financial contributions secured, received and spent

Provision delivered in accordance with Policies ID9-ID10 and agreed timescales

S106 and open-space monitoring

Significant backlog, unspent contributions at risk, or persistent deficiencies