Representation ID: 12844
Received: 28/04/2026
Respondent: Network Rail
Allocations should consider impact on operational railway safety and passenger numbers at nearby stations
Comment
NEDDC Local Plan Issues and Options Consultation on the Strategic Approach to the Location of Development and Refined Sites (March 2026)
45447, 45763,45806,45809,45810 – Former Biwaters Site
Representation ID: 12855
Received: 28/04/2026
Respondent: Network Rail
We note that this allocation has an existing permission and is adjacent to the operational railway boundary. We would again reiterate the importance of the developer working with Network Rail Asset Protection to ensure that there is no impact on operational railway safety from the design and implementation of this scheme as it moves forward.
Comment
NEDDC Local Plan Issues and Options Consultation on the Strategic Approach to the Location of Development and Refined Sites (March 2026)
45919 – Kenning Park land, located to the west of High Street, Clay Cross
Representation ID: 12857
Received: 28/04/2026
Respondent: Network Rail
We note that the proposed allocation is in close proximity to the Clay Cross railway tunnel. It is imperative that any scheme at this location does not impact on the operational safety of the railway tunnel including any associated tunnel shafts. Considerations will include matters such as loading on the tunnel structure, foundation depth and construction methods and drainage. Should development come forward here, the developer would be required to actively engage with Network Rail to demonstrate that the scheme could be delivered safely, without impact to the fabric of the structure.
Comment
NEDDC Local Plan Issues and Options Consultation on the Strategic Approach to the Location of Development and Refined Sites (March 2026)
45920 – Land north of Biwater, Clay Cross
Representation ID: 12864
Received: 28/04/2026
Respondent: Network Rail
This allocation is adjacent to the railway boundary and must be considered accordingly in order that it does not impact on operational railway safety. Considerations will include (but not necessarily be limited to) boundary treatments, drainage, lighting, landscaping and construction methodology. As a statutory consultee, we would expect further consultation in respect of this proposal as it moves forward. In addition, the red line of this allocation appears to incorporate the railway itself and it as noted it is in close proximity to the railway tunnel which will require additional consideration
Comment
NEDDC Local Plan Issues and Options Consultation on the Strategic Approach to the Location of Development and Refined Sites (March 2026)
45445 – Plot H, Coney Green Business Park, Clay Cross
Representation ID: 12866
Received: 28/04/2026
Respondent: Network Rail
This allocation is adjacent to the railway boundary and must be considered accordingly in order that it does not impact on operational railway safety. Considerations will include (but not necessarily be limited to) boundary treatments, drainage, lighting, landscaping and construction methodology. As a statutory consultee, we would expect further consultation in respect of this proposal as it moves forward.
Comment
NEDDC Local Plan Issues and Options Consultation on the Strategic Approach to the Location of Development and Refined Sites (March 2026)
45448 – Land off Bridge Street, Clay Cross
Representation ID: 12902
Received: 28/04/2026
Respondent: Network Rail
We note that the proposed allocation is in close proximity to the Clay Cross railway tunnel. It is imperative that any scheme at this location does not impact on the operational safety of the railway tunnel including any associated tunnel shafts. Considerations will include matters such as loading on the tunnel structure, foundation depth and construction methods and drainage. Should development come forward here, the developer would be required to actively engage with Network Rail to demonstrate that the scheme could be delivered safely, without impact to the fabric of the structure.
Comment
NEDDC Local Plan Issues and Options Consultation on the Strategic Approach to the Location of Development and Refined Sites (March 2026)
45054 – Land North of Burns Drive and East of Southfield Mount, Dronfield
Representation ID: 12903
Received: 28/04/2026
Respondent: Network Rail
This allocation is in proximity to Dronfield railway station and as such the impact of the proposals upon passenger numbers and type at the station should be considered as the development moves forward. Should it be demonstrated that there would be an increase in passenger numbers, contributions to improvements in station facilities and connectivity should be sought from the developer which could include, for example, improvements to passenger information and waiting facilities, car parking and cycle facilities.
Comment
NEDDC Local Plan Issues and Options Consultation on the Strategic Approach to the Location of Development and Refined Sites (March 2026)
45438 – Land off Callywhite Lane, Dronfield
Representation ID: 12904
Received: 28/04/2026
Respondent: Network Rail
The scheme is adjacent to the operational railway boundary and in proximity to Dronfield Station which must be considered should development move forward at this location
Comment
NEDDC Local Plan Issues and Options Consultation on the Strategic Approach to the Location of Development and Refined Sites (March 2026)
45228 – Land at Holmley Common, Dronfield
Representation ID: 12905
Received: 28/04/2026
Respondent: Network Rail
This allocation is in proximity to Dronfield railway station and as such the impact of the proposals upon passenger numbers and type at the station should be considered as the development moves forward. Should it be demonstrated that there would be an increase in passenger numbers, contributions to improvements in station facilities and connectivity should be sought from the developer which could include, for example, improvements to passenger information and waiting facilities, car parking and cycle facilities.
Comment
NEDDC Local Plan Issues and Options Consultation on the Strategic Approach to the Location of Development and Refined Sites (March 2026)
45441 – Former Coal Yard, Grassmoor (Zones B-D)
Representation ID: 12963
Received: 28/04/2026
Respondent: Network Rail
We note that this allocation has an existing permission and is adjacent to the operational railway boundary. We would again reiterate the importance of the developer working with Network Rail Asset Protection to ensure that there is no impact on operational railway safety from the design and implementation of this scheme as it moves forward.