Wyndthorpe Developments supports the inclusion of the Duckmanton Moor Village site comprising the two submitted parcels that are assessed separately within the consultation, in the plan.
A detailed planning case for the site was submitted in relation to the call for sites process alongside a vision document incorporating a concept masterplan. The contents for the documents are not repeated (in full) here however it is noted that the vision included in the submitted vision document noted that:
“The plan aims to transform a large area of previously developed land into a net zero carbon in operation village, featuring diverse housing options, public open spaces, green and blue infrastructure, and local services to benefit local residents and those in the local area.
The development vision includes enhancing local biodiversity, providing economic growth through job creation, and fostering a strong community with accessible leisure, transport and local services facilities. The proposal emphasises innovative, landscape-led design and aims to deliver significant environmental, social and economic growth benefits to the local area, whilst meeting the growth requirements of North East Derbyshire on a site outside of the Green Belt.”
At a strategic level the site is a well-located one, close to existing settlements which it can bring benefits to and share services with. It is also close to both Chesterfield, the M1 and the large Markham Value industrial estate. The site is not in Green Belt.
The allocation of the site clearly corresponds to the wishes of the majority of respondents to an earlier issues and options consultation, with preference for the allocation of strategic sites and new settlements and protection of the Green Belt.
Wyndthorpe Developments supports the majority of the comments on the site included in the consultation. It adds commentary below next to comments from the consultation:
“The site may be able to support approximately 2000 - 3000 dwellings, together with employment land and other supporting community facilities. Mitigation measures have not been applied to this site capacity yet and may result in an altered total.”
Comment: Wyndthorpe Developments confirms that the site can accommodate the housing numbers specified and at a level towards the maximum level specified.
Robert Wilkins, of Wilkins Hammond based in Chesterfield, who is providing advice to Wyndthorpe Developments notes as follows in in relation to housing number delivery:
“Our working assumption is that the promotion of this site will follow the trajectory of the development of the Plan, the submission of which should fall at the end of 2026. We understand that a planning application will be submitted at the date of adoption or very soon afterwards, unless an application is requested sooner by the local planning authority. Our advice and discussions have therefore centred around engaging in late 2026/early 2027, with appropriate major house builders, those being of sufficient national size with a strong regional presence, to appraise the potential development of the site, with a view to supporting the planning position to ensure an early delivery of homes as soon as possible, following a planning permission being granted.
Given the scope of the development site, we would normally expect that four major house builders would concurrently purchase and develop individual phases and attract new home purchasers through their nationally driven but locally focused marketing campaigns. Working on an assumption that the geopolitical factors that affect our economy currently have passed, and therefore working on the further assumption that more normal market conditions prevail at the time, we would expect each house builder to appraise the site on the basis of an expected delivery of at least 40 units per year from each site. Those figures have been historically achievable and have been exceeded in the past. That suggests that a minimum of 160 dwellings per year should be forecastable, given the past information available. The current performance of the new build housing market and a forecast of how that market would more normally perform suggests that a return to a fuller operational sales and delivery capacity, as time passes, is reasonable.
We should stress that this remains a high level opinion at this time. There may well be wider economic factors that impact the UK housing market going forward both positively or negatively. That said, the new homes sales market has shown resilience on many occasions, and it is reasonable to assume that this will continue, as demand for home ownership remains an important milestone for the population to achieve.”
The delivery of a minimum of 160 houses per year would easily reach the minimum housing delivery number for the site shown in the consultation over the plan period.
Mr Wilkins confirms his significant practical and local experience in terms of assisting with the delivery of recent housing schemes in the North East Derbyshire, Chesterfield and Bolsover Districts, listing the following as examples:
“Wheeldon Mill Tapton
North Moor View Brimington
Mastin Moor Staveley Chesterfield - Phases 1&2
Bolsover - Oxcroft Lane
Inkersall Chesterfield
Stretton Clay Cross
Tupton/Wingerworth -Derby Road
Calow-Oakes Farm Lane
Holmewood - All phases”
In response to the comment around mitigation measures, concept masterplans for the site already accommodate significant levels of green infrastructure and protected areas for ecology. Whilst the masterplan may evolve with the location of some land uses changing, it is the case that the housing numbers specified and those around the higher end of the tier, can be met on the site.
“Initial landscape and heritage assessments point towards a possible impact on the settings of Sutton Scarsdale Hall (scheduled monument, grade I listed building) and its Conservation Area, and the collection of heritage assets at Bolsover Castle (scheduled monument, grade I listed buildings, grade I Registered Park & Garden, Conservation Area).”
Comment: Wyndthorpe Developments has commissioned detailed heritage impact and landscape assessment documents. These assessments have been provided to the Council and demonstrate that the site can be developed without an unacceptable impact on heritage or landscape.
“Due to the size of the site, the ecology impact ranges from low to high. There are potential Local Wildlife Sites, but there is also scope for development on the ecologically low value fields.”
Comment: Wyndthorpe Developments has met with the Derbyshire Wildlife Trust together with NEDC Officers. There is no objection to the allocation of the site and dialogue is continuing. It is proposed to review the masterplan together with consultees and review opportunities for moving different land uses to different areas to reflect feedback received. This can then inform an allocation plan for the site in the local plan.
“Highway access and impacts on the local highway network will need further consideration.”
Comment: These matters will need further consideration as the site moves forward towards a planning application however Derbyshire County Council has confirmed that it has no objection to the site’s allocation. It has provided this confirmation to NEDC as part of the earlier issues and options consultation response and, as NEDC Officers are aware, to Wyndthorpe Developments as part of follow-on correspondence earlier this year.
“The site was formerly part of the larger Arkwright opencast coal site, including the old Arkwright village, which was relocated due to methane gas issues.
Approximately 2% of site 45541 is covered by flood risk zones 2 and 3. There is also some risk of surface water flooding.
Proposed cycle routes and greenways cross the site.
Part of the site is close to a landfill site and a recycling facility.
If this site were to be taken forward as an allocation, mitigation measures for the above constraints will need to be considered and any Local Plan policy text should include the requirement to address and mitigate the constraints listed above.”
Comment: All of these points are noted. Detailed reports produced by PWA Group and the response of the Mining Remediation Authority provide confirmation that the site can be developed. The other points highlight considerations which have been taken into account at the concept masterplan stage. Wyndthorpe Developments looks forward to liaising with NEDC Officers on the text of a local plan policy relating to the site.