Annex 4 - Updated Table 10.1 - Monitoring Framework

Table 10.1: Monitoring Framework

Policy

Targets

Monitoring Details and Indicators

The Economy:

D1: Sustainable Economic Growth,D2: Jobs & Training, D3: Tourism, N1: Dronfield, Eckington and Killamarsh Town Centres, N3: Employment Land, W1: Strong and Vibrant Communities, W3: Diversifying the Rural Economy, S1: Clay Cross Town Centre, S2: Regeneration, E1: Regeneration

The following policy references work towards meeting these objectives:

SS1, SS2, SS3, SS4, SS5, SS6, SS7, SS8, LC1, LC4, LC6, WC1, WC2, WC3, WC4, WC5, WC6, WC7, SP1, SP2, SP3, SP4, SDC1, ID1

SS2 - Spatial Strategy and the Distribution of Development

Plan Objectives: D1, D2, D4, D5, D6, D7, D8, D9, D11, D12, D13, D14, N1, N3, W1, W2, W3, S1, S2, E1, E2.

Employment

  • Delivery of at least 43ha of employment land by 2034

Annual monitoring of employment land take-up.

Progress on delivery to be reported annually in the AMR.

SS3, SS4, SS5 and SS6 – Strategic Sites and Regeneration Priority Area

Plan Objectives: D1, D2, D5, D10, D11, D13, S2, E1, E2.

Employment

  • Delivery of a minimum of 4ha of additional employment land on The Avenue Strategic Site, Wingerworth.
  • Delivery of 5ha of employment land including provision for starter units and managed workspace on the Former Biwaters Strategic Site, Clay Cross.
  • Delivery of 4ha of employment land on the Markham Vale Strategic Site, Long Duckmanton.
  • Potential delivery of up to 28ha of employment land on the Former Coalite Chemical Works Priority Regeneration Area, Long Duckmanton.

Annual monitoring of employment land take-up.

Progress on delivery to be reported annually in the AMR.

WC2 – Principal Protected Employment Areas

WC3 – General Employment Areas

Plan Objectives: D1, D2, D4, D9, D12, D13, N1, N3, S1, S2, E1, E2.

  • No loss of B2, B8 or E(g) land uses on employment areas beyond the expected rate of 20ha over the Plan period.

Annual monitoring of loss of employment land.

Position to be reported annually in the AMR.

WC4 – Retail Hierarchy and Town Centre Uses

Plan Objectives: D1, D2, D3, D4, D9, D12, D13, N1, W1, W3, S1.

  • Regeneration and enhancement of the District's town and local centres
  • No net loss in retail floorspace and social infrastructure within Town Centre boundaries.

Annual monitoring of new or loss of existing retail floorspace and social infrastructure through planning permissions.

Position to be reported annually in the AMR.

The Community:

D4: Sustainable Communities, D5: Housing for All

The following policy references work towards meeting these objectives:

SS1, SS2, SS3, SS4, SS7, SS8, SS11, LC1, LC2, LC3, LC4, LC7, LC8, LC9, WC1, WC2, WC3, WC4, WC5, WC6, WC7, SDC1, ID4, ID5, ID10

SS2 - Spatial Strategy and the Distribution of Development

Plan Objectives: D1, D2, D4, D5, D6, D7, D8, D9, D11, D12, D13, D14, N1, N3, W1, W2, W3, S1, S2, E1, E2.

Housing

  • Delivery of at least 6,600 dwellings by 2034
  • Delivery of 330 dwellings per year

Annual monitoring of housing completions and commitments.

Progress on delivery to be reported annually in the AMR.

Delivery over the previous three years to be above 75% of the housing requirement, in line with the Housing Delivery Test.

SS3, SS4 and SS6 – Strategic Sites and Regeneration Priority Area

Plan Objectives: D1, D2, D5, D10, D11, D13, S2, E1, E2.

Housing

  • Delivery of 733 dwellings on The Avenue Strategic Site, Wingerworth within the Plan Period
  • Delivery of 825 dwellings on the Former Biwaters Strategic Site, Clay Cross within the Plan Period.
  • Potential delivery of up to 660 dwellings on the Former Coalite Regeneration Area, Long Duckmanton

Annual monitoring of housing completions, housing commitments and anticipated future delivery timescales.

Progress on delivery of allocations and five-year housing land supply to be reported annually in the AMR and Five Year Housing Land Supply Statement.

LC1 - Housing Allocations

Plan Objectives: D1, D5.

  • 330 dwellings to be completed per year.
  • A five year supply of housing to be maintained throughout the lifetime of the Plan in order to sufficiently meet residual housing need.

Annual monitoring of housing completions, housing commitments and anticipated future delivery timescales.

Progress on delivery of allocations and five-year housing land supply to be reported annually in the AMR and Five Year Housing Land Supply Statement.

Delivery over the previous three years to be above 75% of the housing requirement, in line with the Housing Delivery Test.

LC2 - Affordable Housing

Plan Objectives: D5.

  • Affordable housing developments to be achieved in line with policy.
  • 20% or 30% affordable housing provision on sites of 10 or more dwellings

Annual monitoring of Affordable Housing completions and commitments.

Progress on delivery and achievement of policy target to be reported annually in the AMR.

LC4 - Type and Mix of Housing

Plan Objectives: D1, D5.

  • Developments coming forward during the Plan Period should provide a mix of types and sizes of dwellings.
  • Accommodation available for older people and people with disabilities to increase.
  • At least 20% of dwellings in developments of more than 10 dwellings comply with Part M Category 2 of the Building Regulations – accessible and adaptable dwellings
  • Sufficient Self and Custom Build plots are available to meet the demand on the Self and Custom Build Register
  • Annual monitoring of developments in relation to Table 5.1, breaking down both market and affordable housing completions into size.
  • The number of commitments and completions of specialist housing.
  • The number of developments providing 20% of dwellings which comply with Part M Category 2 of the Building Regulations – accessible and adaptable dwellings.
  • The number of Self and Custom Build Plots permitted and the number of entries on the Self Build Register.

LC8 - Provision for Traveller Sites

Plan Objectives: D5.

  • To meet the need identified in the Gypsy and Traveller Accommodation Assessment (GTAA)

Annual monitoring of delivery of traveller pitches.

Progress on delivery to be reported annually in the AMR.

ID1 – Infrastructure Delivery and Developer Contributions

Plan Objectives: D1, D4.

  • To provide the necessary infrastructure to support new development.
  • Annual monitoring of critical and essential infrastructure projects listed in the Infrastructure Delivery Plan. Progress on delivery to be reported in the Infrastructure Funding Statement and AMR.
  • Monitoring of developer contributions secured through S106 agreements.

The Environment:

D6: Green Belt,D7: Settlement Identity,D8: Addressing Climate Change, D9: Design and Place Making, D10: Heritage Assets, D11: Natural Assets, D12: Sustainable Transport, D13: Local Amenity, D14: Strategic Co-operation, N2: Countryside Recreation, W2: Countryside Character, E2: Land Remediation, E3: Environmental Quality

The following policy references work towards meeting these objectives:

SS1, SS2, SS5, SS6, SS7, SS8, SS9, SS10, SS11, LC3, LC5, WC1, WC2, WC3, WC4, WC5, WC6, WC7, SDC2, SDC3, SDC4, SDC5, SDC6, SDC7, SDC8, SDC9, SDC10, SDC11, SDC12, SDC13, SDC14, SDC15, ID2, ID3, ID7, ID8, ID9, ID10

SS9 – Development in the Countryside

Plan Objectives: D8, D9, D10 & D11.

No planning permissions for housing, employment and retail development in the countryside contrary to the policy.

Annual monitoring of planning permissions granted / appeals upheld contrary to the policy which are not justified by material considerations.

SS10 - North East Derbyshire Green Belt

Plan Objectives: D6.

No planning permissions for housing, employment and retail development in the Green Belt contrary to the policy.

Annual monitoring of planning permissions granted / appeals upheld contrary to the policy which are not justified by very special circumstances.

SS11 - Local Settlement Gaps

Plan Objectives: D4, D7, S1.

  • Maintain the extent of separation between relevant settlements.
  • Annual monitoring of planning permissions granted / appeals upheld contrary to the policy, which are not justified by material considerations.
  • Monitoring of the potential impact of such developments, and whether they require an amendment to the existing LSGs, or a full review.

SDC4 – Biodiversity and Geodiversity

Plan Objectives: D11.

  • No significant effect on European Sites caused by the NEDDC Local Plan either alone or in-combination

In cooperation with neighbouring authorities, monitoring the predicted traffic movements every 3 to 5 years, and comparing these to the baseline set out in the Habitats Regulation Assessment – Appropriate Assessment Report, 2018.