Main Modifications to the North East Derbyshire Local Plan (Publication Draft), 2020

Ends on 23rd December 2020 (22 days remaining)
If you are having trouble using the system, please try our help guide.

Annex 1 - Appendix A – List of saved policies of the 2005 Local Plan deleted by this Plan

Chapter 1 - General Strategy

GS1

Sustainable Development

GS2

Development in the Green Belt

GS3

Major Developed Sites in the Green Belt

GS5

Settlement Development Limits

GS6

New Development in the Countryside

GS7

Change of Use and Conversions

GS8

Temporary Land Uses and Buildings

GS9

Planning Obligations

GS11

Hazardous Installations

GS12

Access for All

Chapter 2 – Natural Environment

NE1

Landscape Character

NE2

Special Landscape Areas

NE3

Protecting and Managing Features of Important to Wild Flora and Fauna

NE4

Sites of National Importance for Nature Conservation

NE5

Other sites of Importance for Nature Conservation

NE6

Development Affecting Nationally Rare Species

NE9

Development and Flood Risk

Chapter 3 – Built Environment

BE1

General Design Principles

BE2

External Lighting and Floodlighting

BE3

Security Shutters

BE5

Percent For Art

BE6

Scheduled Ancient Monuments and Archaeological Sites

BE7

Alterations and Works to Listed Buildings

BE8

Change of Use of a Listed Building

BE9

Development in the Vicinity of a Listed Building

BE11

Development Within and Adjoining Conservation Areas

BE12

Demolition of Unlisted Buildings and Structures Within a Conservation Area

BE13

Historic Parks and Gardens

Chapter 4 – Employment Development & Tourism

E1

New Employment Land Provision

E2

Callywhite Lane Extension

E3

Norwood Extension – Killamarsh

E4

Mixed Use site Former Avenue Coking Works, Wingerworth

E5

Mixed Use Development Former Biwaters site, Clay Cross

E6

Existing Employment Areas

E7

Development in New and Existing Areas

E8

Employment Development in Other Areas

E9

Employment Development in the Countryside

E10

Tourism Development

E11

Tourist Accommodation

E12

Camping and Caravan sites

Chapter 5 – Housing

H1

Sites for residential development

H2

Housing Development on Other Sites Within the SDLs

H3

New Housing Outside Settlement Development Limits

H5

Domestic Extensions

H6

Affordable Housing Provision in the Main Settlements

H7

Affordable Housing in Settlements with a Population of 3000 or fewer

H8

Affordable Housing: Alternative Provision

H9

Affordable Housing: Exception Sites in Rural Areas

H11

Sites for Gypsies and Travellers

H12

Design and Layout of New Housing

Chapter 6 – Town Centres & Retailing

SH1

Clay Cross Town Centre Development

SH2

Retail Development in Town Centres

SH3

Ground Floor Development Within Centres

SH4

Upper Floor Development Within Centres

SH5

Retail Development in Edge of Centre Locations

SH6

Retail Developments in Out of Centre Locations

SH8

Loss of Local Facilities

SH9

Hot Food Take-Aways, Restaurants and Public Houses

SH10

Weekly Markets and Car Boot Sales

SH11

Farm Shops

SH12

Garden Centres

Chapter 7 – Transport

T1

Clay Cross Diversion

T2

Highway Access and the Impact of New Development

T3

Traffic Management

T4

Travel Plans

T5

Walking and Cycling

T6

Public Transport

T8

Disused Transport Routes

T9

Car Parking Provision

T10

Car Park, Dronfield Station

Chapter 8 – Recreation & Leisure

R1

Outdoor Recreation Space Standards

R2

Formal Recreation Facilities

R3

Urban Green Space

R4

Allotments

R5

Providing for Children's Play Space through New Development

R8

Specialist and Noise Generating Recreational Activities

R9

Equestrian Development

R10

Golf Courses and Driving Ranges

R11

Development Affecting Public Rights of Way

R12

The Chesterfield Canal

R13

Country Parks

Chapter 9 – Community Facilities, Services & Utilities

CSU1

Sites for Educational Use

CSU2

Purpose Built Community Facilities

CSU3

Protection of Existing Community Facilities

CSU4

Surface and Foul Water Drainage

CSU5

Development in the Vicinity of Sewage Treatment Works

CSU6

Contaminated Land

CSU7

Renewable Energy

CSU8

Telecommunications


If you are having trouble using the system, please try our help guide.
back to top back to top