(1) 10 MONITORING AND IMPLEMENTATION

10.1 The Local Plan period covers a 16 year period, during which time it is likely that significant changes could occur which will affect the delivery of the Plan's Strategy. It may be, for example, that the rate of delivery of housing or employment land does not take place as anticipated, new previously developed sites may become available as a result of future economic changes, or new infrastructure may be required. Other changes may also require a review of the Local Plan, such as the emergence of new evidence. The Local Plan is intended to set out a clear path to delivery, but also to provide flexibility in order to respond to continuously changing circumstances.

10.2 The delivery of this Local Plan will be monitored on a continuing basis, and formally published through the Authority's Monitoring Report, which will propose any refinements or reviews at any stage during the Plan period.

10.3 For each policy, the Plan identifies relevant targets, indicators, and triggers for a review of the policy. This means that the effectiveness of each policy and implementation measure can be monitoring.

10.4 The table below sets out the indicators, targets and review triggers for each policy within the Local Plan. The delivery and monitoring mechanisms are also identified.


Policy

Targets

Indicators

Delivery & Monitoring Mechanism

Review Trigger

SS1 - Sustainable Development

Plan Objectives: All

  • N/A
  • N/A
  • N/A
  • N/A

SS2 - Spatial Strategy and the Distribution of Development

Plan Objectives: D1, D2, D4, D5, D6, D7, D8, D9, D11, D12, D13, D14, N1, N3, W1, W2, W3, S1, S2, E1, E2.

Housing

  • Delivery of at least 6,600 dwellings by 2034
  • 330 dwellings per year

Employment

  • Delivery of at least 41ha of employment land by 2034

Housing

  • Net housing completions per year
  • Overall number of homes completed

Employment

  • Employment land approved & completed (net developed area) per year
  • Overall Ha. of employment land completed and approved

Delivery

Local Plan

Planning Applications

Monitoring

  • AMR
  • SMART reports

Housing

  • Significant under delivery in three consecutive years

Employment

  • Significant under delivery in three consecutive years

SS3 - The Avenue

Plan Objectives: D1, D2, D5, S2.

Housing

  • Provide up to 700 dwellings by 2034

Employment

  • A minimum of 4ha (net) of new employment land

Housing

  • Housing completions in line with trajectory

Employment

  • Gross employment floorspace completed

Delivery

Local Plan

Planning Applications

Monitoring

  • AMR
  • SMART reports
  • Linked to Policy SS2

SS4 - Former Biwaters Site, Clay Cross

Plan Objectives: D1, D2, D5, S2.

Housing

  • Provide up to 825 dwellings by 2034.

Employment

  • A minimum of 8ha (net) of new employment land provided

Housing

  • Housing Completions in line with trajectory

Employment

  • Amount of employment land approved and developed

Delivery

Local Plan

Planning Application

Monitoring

  • AMR
  • SMART reports
  • Linked to Policy SS2

SS5 - Markham Vale

Plan Objectives: D1, D2, D10, D11, D13, E1, E2.

  • Provide 5ha (net) of new employment land
  • Amount of employment land approved and completed

Delivery

Local Plan

Planning Application

Monitoring

  • AMR
  • SMART reports
  • Linked to Policy SS2

SS6 - Coalite Priority Regeneration Area

Plan Objectives: D1, D2, D10, D11, D13, E1, E2.

Housing

  • Site housing completion, based on any planning permission granted

Housing

  • Net housing completions

Delivery

Local Plan

Planning Application

Monitoring

  • AMR
  • SMART reports
  • Linked to Policy SS2

SS7 - Development on Unallocated Land within Settlements with defined Settlement Development Limits

Plan Objectives: D1, D4, D7, D8, D9, D13.

  • Development to be contained within SDLS
  • Number of housing developments taking place outside SDL

Delivery

Planning Applications

Monitoring

  • AMR
  • Planning Applications
  • Planning permission for developments approved contrary to policy

SS8 - Development in Small Villages & Hamlets

Plan Objectives: D1, D4, D7, D8, D9, D13.

  • No developments approved in small villages and hamlets which are contrary to policy
  • Number and percentage of housing units completed on unallocated sites in small villages and hamlets

Delivery

Planning Applications

Monitoring

  • AMR
  • Planning Applications
  • None

SS9 - Development in the Countryside

Plan Objectives: D8, D9, D10, D11.

  • No applications for development in the countryside upheld at appeal
  • Any appeals for applications in the countryside upheld

Delivery

Planning Applications

Monitoring

  • Planning Applications
  • Increasing trend of appeals upheld contrary to policy

SS10 - North East Derbyshire Green Belt

Plan Objectives: D6. .

  • 0 planning applications approved in the Green Belt contrary to policy
  • Number of planning applications and type of development approved in the Green Belt under this policy
  • Ha. of Green Belt lost to inappropriate development per annum

Delivery

Local Plan

Planning Applications

Monitoring

  • Planning applications
  • SMART reports
  • Applications approved in Green Belt with no very special circumstances demonstrated

SS11 - Local Settlement Gaps

Plan Objectives: D4, D7, S1.

  • 0 planning applications in LSGs without mitigation
  • Number of planning applications and type of development approved in the LSGs

Delivery

Local Plan

Planning Applications

Monitoring

  • Planning Applications
  • SMART reports
  • Applications approved in LSGs with no mitigation

LC1 - Housing Allocations

Plan Objectives: D1, D5.

  • Annual housing delivery in line with allocations in settlements
  • Maintenance of a five year supply of housing sufficient to meet residual housing need
  • 330 dwellings completed per year
  • Net housing completions per year in line with allocations
  • Five year supply

Delivery

Local Plan

Planning Applications

Monitoring

  • AMR
  • SMART reports
  • Significant under delivery in three consecutive years

LC2 - Affordable Housing

Plan Objectives: D5

  • Affordable housing developments achieved in line with policy
  • At least 20% or 30% affordable housing provision on sites of more than 10 dwellings
  • Percentage of affordable units delivered on and off site per eligible scheme
  • Affordable housing units approved and completed by tenure type
  • Loss of affordable housing by affordable units by tenure type

Delivery

Local Plan

Planning Applications

Monitoring

  • AMR
  • SMART reports
  • Applications approved below target without an 'open book' procedure taking place

LC3 - Exception Sites for Affordable Housing

Plan Objectives: D5, D13.

  • All housing built on exception sites meets an identified need for affordable housing
  • Less than 50% subsidiary element of market housing
  • Number of affordable housing completions on exception sites
  • Number of subsidiary market housing

Delivery

Planning Applications

Monitoring

  • AMR
  • Identified trend in appeals granted contrary to policy

LC4 - Type and Mix of Housing

Plan Objectives: D1, D5.

  • To achieve a mix of types and sizes of dwellings
  • To increase the amount of accommodation available for older people to help sustain their independence
  • At least 20% of dwellings in developments of 10 dwellings or more to comply with Part M Category 2 of the Building Regulations – accessible and adaptable dwellings
  • Ensure that sufficient Self and Custom Build plots are available to meet the demand on the Self and Custom Build Register
  • Breakdown of both market and affordable housing completions into size (1 bed, 2 bed, 3 bed, 4 and over)
  • Number of commitments and completions of specialist housing such as extra-care housing, or nursing homes
  • Number of commitments which are required to comply with Part M Category 2 of the Building Regulations – accessible and adaptable dwellings
  • Number of Self and Custom Build Plots permitted
  • Number of entries on the Self Build Register

Delivery

Local Plan

Planning Applications

Monitoring

  • AMR
  • SMART reports
  • Mix of dwellings: Persistent under delivery of one dwelling size
  • Specialists housing: No permissions for specialist housing in any three years
  • Accessible and adaptable dwellings: Applications approved below target without an 'open book' procedure taking place
  • Self and Custom Build: Persistent inability to meet demand

LC5 - Residential Extensions

Plan Objectives: D13.

  • No applications for extension approved contrary to policy criteria.
  • Planning applications approved and completed

Delivery

Local Plan

Monitoring

  • Planning Applications
  • None

LC6 - Agricultural, Forestry and Other Occupational Dwellings in the Countryside

Plan Objectives: D1.

  • All occupational dwellings in the countryside to be in accordance with policy
  • Number of new build dwellings in the countryside, approved and completed

Delivery

Local Plan

Monitoring

  • Planning Applications
  • SMART reports
  • Trend in appeals and applications granted contrary to policy

LC7 - Removal of Agricultural and Other Occupancy Conditions

Plan Objectives: D5

  • All changes in the use of former agricultural or occupational dwellings in the countryside to be in accordance with policy
  • Number of use changes in the countryside

Delivery

Planning Applications

Monitoring

  • AMR
  • SMART reports
  • Identified trend in appeals granted contrary to policy

LC8 - Provision for Traveller Sites

Plan Objectives: D5

  • To meet the need identified in the Gypsy and Traveller Accommodation Assessment (GTAA)
  • Number of net additional pitches

Delivery

Local Plan

Planning Applications

Monitoring

  • AMR
  • SMART reports
  • Gypsy and Traveller Assessment
  • No applications for Traveller pitches and plots approved within 5 years after adoption of the Local Plan

WC1 – Dronfield Regeneration Area

Plan Objectives: D1, D2, D4, D9, D12, D13, N1, N3.

  • Comprehensive development proposal submitted and approved
  • A minimum of 6ha (net) of new employment land provided and completed
  • Amount of employment land approved and developed

Delivery

Local Plan

Planning Applications

Monitoring

  • AMR
  • None

WC2 – Principal Protected Employment Areas

Plan Objectives: D1, D2, D4, D9, D12, D13, N1, N3, S1, S2, E1, E2.

  • No loss of protected B1, B2 or B8 uses on employment areas beyond expected rates.
  • Developments of non- B1, B2 and B8 floorspace

Delivery

Local Plan

Planning Applications

Monitoring

  • AMR
  • SMART reports
  • Amount of employment land being lost beyond approx. 1ha/ year (with WC3)

WC3 – Employment Areas

Plan Objectives: D1, D2, D4, D9, D12, D13, N1, N3, S1, S2, E1, E2.

  • No loss of protected employment areas beyond expected rates.
  • Amount of non-employment uses permitted

Delivery

Local Plan

Planning Applications

Monitoring

  • AMR
  • SMART reports
  • Amount of employment land being lost beyond approx.. 1ha/ year (with WC2)

WC4 – Development on Employment Land

Plan Objectives: D1, D2, D4, D9, D12, D13, N1, N3, S1, S2, E1, E2.

  • No land lost to other uses contrary to policy criteria.
  • Planning applications approved and completed

Delivery

Local Plan

Planning Applications

Monitoring

  • AMR
  • SMART reports
  • None - See WC2, WC3.

WC5 – Retail Hierarchy and Town Centre Uses

Plan Objectives: D1, D2, D3, D4, D9, D12, D13, N1, W1, W3, S1.

  • Regeneration and enhancement of the District's town and local centres
  • No net loss in floorspace for town centre uses
  • Number of vacant units in town and local centres
  • Loss of retail floorspace

Delivery

Local Plan

Planning Applications

Town Centre Masterplans

Monitoring

  • AMR
  • SMART reports
  • Significant (10%) reduction in any one town centre's retail floorspace provision (exc. Vacant units)

WC6 – Visitor Economy and Tourism Development in the Countryside

Plan Objectives: D1, D2, D3, D4, D9, D12, D13, N1, N2, W2, W3, S1.

  • Improvement in the District's tourism economy
  • No applications for tourism development in the countryside approved contrary to policy criteria or upheld at appeal
  • Amount of tourism expenditure and jobs.
  • Tourism developments approved within / contrary to Policy

Delivery

Local Plan

Planning Applications

Monitoring

  • AMR
  • SMART reports
  • None

WC7 – Tourist Accommodation in the Countryside

Plan Objectives: D1, D2, D3, D4, D9, D12, D13, N1, N2, W2, W3, S1.

  • No net loss in number of bed spaces
  • Net additional bed spaces

Delivery

Planning Applications

Monitoring

  • AMR
  • SMART reports
  • None

SP1 - Dronfield

Plan Objectives: N1.

  • N/A
  • N/A

N/A

  • N/A

SP2 - Clay Cross

Plan Objectives: S1.

  • N/A
  • N/A

N/A

  • N/A

SP3 - Eckington

Plan Objectives: N1.

  • N/A
  • N/A

N/A

  • N/A

SP4 - Killamarsh

Plan Objectives: N1.

  • N/A
  • N/A

N/A

  • N/A

SDC1 - Re-use of Buildings in the Green Belt and Countryside

Plan Objectives: D1, D3, D5, W1, W3.

  • No application approved for buildings in the Green Belt and countryside contrary to criteria in policy
  • Number of planning applications approved within Green Belt and Countryside

Delivery

Planning Applications

Monitoring

  • AMR
  • SMART reports
  • More than 10% of applications approved contrary to policy

SDC2 - Trees, Woodland and Hedgerows

Plan Objectives: D11, W2.

  • Reduce the amount of trees lost through site developments
  • Number of TPO and Conservation Area applications approved and refused

Delivery

Local Plan

Planning Applications

Monitoring

  • AMR
  • More than 10% of applications approved contrary to policy

SDC3 - Landscape Character

Plan Objectives: D11, W2.

  • No proposals which would impact sensitive landscape character areas (LCAs) upheld at appeal
  • No proposals which would negatively impact the national park approved
  • Planning approvals in LCAs
  • Appeals upheld contrary to policy
  • Applications approved contrary to policy

Delivery

Local Plan

Planning Applications

Monitoring

  • AMR
  • Increasing trend of appeals upheld contrary to policy

SDC4 - Biodiversity and Geodiversity

Plan Objectives: D11.

  • No net loss of quantity or quality of areas of biodiversity or geodiversity importance
  • No developments approved which would have negative impacts on protected species or sites
  • Appeals for developments upheld contrary to policy
  • Number of SSSIs
  • Number of Wildlife Sites
  • Condition of SSSIs and LWSs
  • Number of RIGS

Delivery

Local Plan

Planning Applications

Monitoring

  • AMR
  • Desginatedsites.naturalerngland.org.uk
  • Derbyshire Wildlife Trust Environmental Records Centre
  • Increasing trend of appeals upheld contrary to policy
  • Overall loss of biodiversity and geodiversity sites

SDC5 - Development within Conservation Areas

Plan Objectives: D10.

  • All developments within a conservation area through design will seek to preserve or enhance the character of its setting
  • Number of planning applications approved contrary to policy

Delivery

Local Plan

Planning Applications

  • AMR
  • SMART reports
  • Increasing trend of appeals being upheld against this policy

SDC6 - Development affecting Listed Buildings

Plan Objectives: D10.

  • All changes or alterations to listed properties to be approved through planning permission
  • Number of planning applications submitted for listed buildings
  • Number of planning applications approved contrary to policy

Delivery

Local Plan

Planning Applications

Monitoring

  • AMR?
  • SMART reports
  • Increasing trend of appeals being upheld against this policy

SDC7 - Scheduled Monuments and Archaeology

Plan Objectives: D10.

  • All applications aim to protect and enhance Designated assets
  • Number of scheduled monuments
  • Number of archaeological sites
  • Number of applications affecting scheduled monuments and/or local archaeology
  • Number of buildings/ sites on the Heritage at Risk Register

Delivery

Local Plan

Planning Applications

Monitoring

  • AMR
  • Increasing trend of appeals being upheld against this policy
  • Recorded negative impacts on assets

SDC8 - Registered Parks and Gardens

Plan Objectives: D10.

  • All applications seek to preserve or enhance the surrounding/affected landscape character of a registered park or garden
  • Number of applications affecting registered parks or gardens

Delivery

Local Plan

Planning Applications

Monitoring

  • AMR
  • Increase in the number of appeals which would negatively affect registered parks or gardens

SDC9 - Non-designated Local Heritage Assets

Plan Objectives: D10.

  • All applications seek to improve and protect non-designated assets
  • Number of applications affecting/for non-designated heritage assets
  • Number of buildings on the local list
  • Number of buildings demolished on the local list

Delivery

Local Plan

Planning Applications

Monitoring

  • AMR
  • Appeals granted which will negative affect assets

SDC10 - Decentralised, Renewable and Low Carbon Energy Generation

Plan Objectives: D8.

  • Increase trend of renewable energy provided above given baseline figure (if data available)
  • Increase production of energy from decentralise, renewable and low carbon energy generation infrastructure
  • Renewable energy capacity of approved and completed schemes

Delivery

Local Plan

Planning Applications

Monitoring

  • AMR
  • No increase in energy sourced from decentralised, renewable or low carbon infrastructure
  • Declining trend of decentralised, renewable and low carbon energy

SDC11 - Flood Risk and Drainage

Plan Objectives: D8.

  • No applications granted permission contrary to advice from the Environment Agency on flooding
  • Surface water to be managed on site
  • Number of applications on flood risk areas

Delivery

Local Plan

Planning Applications

Environment Agency

Monitoring

  • AMR
  • Applications granted contrary to EA advice

SDC12 - High Quality Design and Place-Making

Plan Objectives: D9.

  • All developments achieve high quality design
  • The number of developments refused for non-compliance with policy

Delivery

Local Plan

Planning Applications

Monitoring

  • AMR
  • More than 40% appeal losses against the application of this policy

SDC13 - Environmental Quality

Plan Objectives: D13, E3.

  • No applications or developments to have adverse effects on air, light, noise, ground or water pollution
  • No proposals to have negative effects on the local ecology
  • No increase in greenhouse gas emissions and energy consumption
  • Number of applications which would increase levels of pollution
  • Number of applications which would affect local ecology
  • Use of coal and oil sourced energy

Delivery

Local Plan

Planning Applications

Monitoring

  • AMR
  • https://www.gov.uk/government/statistical-data-sets/total-final-energy-consumption-at-regional-and-local-authority-level
  • Increase in number of appeals upheld contrary to policy
  • Persistent increased in the use of coal and oil sourced energy

SDC14 - Land potentially affected by Contamination or Instability

Plan Objectives: D9, E2.

  • All proposals permitted addressing and mitigating any land stability or contamination issues
  • Number of schemes determined in accordance with Environment Agency and Coal Authority advice
  • Number of applications granted on brownfield sites

Delivery

Local Plan

Planning Applications

Monitoring

  • AMR
  • Coal Authority
  • Permissions granted contrary to Environment Agency or Coal Authority advice

  • No applications approved contrary to Health and Safety Executive advice
  • Number of planning applications which are affected by hazardous uses

Delivery

Local Plan

Planning Applications

Monitoring

  • AMR
  • Applications approved contrary to Health and Safety Executive advice

ID1 - Infrastructure Delivery and Developer Contributions

Plan Objectives: D1, D3.

  • Provide sufficient infrastructure needed to support new and proposed development
  • Provision of essential infrastructure
  • S.106 agreements and/or developer contributions received

Delivery

Local Plan

Planning Applications

Monitoring

  • AMR
  • Increasing trend of successful appeals against developer contributions

ID2 - Provision and Safeguarding of Transport Infrastructure

Plan Objectives: D12.

  • Achieve schemes identified in Infrastructure Delivery Plan
  • Number of approved and completed transport infrastructure schemes

Delivery

Local Plan

Planning Applications

Highways

Monitoring

  • AMR
  • None

ID3 - Sustainable Travel

Plan Objectives: D12.

  • All major development proposals to promote sustainable travel through the outlined interventions
  • Amount of new residential development within 30 minutes of public transport time of a GP, hospital, primary school, secondary school, areas of employment and major retail centres
  • Number of new dwellings built within 400m of a bus stop or railway station
  • number of new dwellings built within 400m and 1,500m of an infant or junior school and within 2,000m of a secondary school
  • Percentage of approved and completed schemes that comply with current car parking standards

Delivery

Local Plan

Planning Applications

Monitoring

  • AMR
  • Appeals granted contrary to criteria set out in policy
  • Permission granted contrary to current parking standards

ID4 - New Social Infrastructure

Plan Objectives: D4.

  • Net increase in local community facilities
  • Increase in local community facilities

Delivery

Local Plan

Planning Applications

Monitoring

  • AMR
  • No increase in social infrastructure

ID5 - Loss of Existing Social Infrastructure

Plan Objectives: D4.

  • No loss of existing local community facilities
  • Loss of existing local community facilities

Delivery

Local Plan

Planning Applications

Monitoring

  • AMR
  • Significant loss of existing social infrastructure within short term

ID6 - Green Infrastructure

Plan Objectives: D8, D11, D12, N2.

  • Annual increase in identified green infrastructure network
  • Protection of existing GI
  • Quantity of new GI that is approved and completed
  • No loss of existing GI

Delivery

Local Plan

GI Strategy

Monitoring

  • AMR
  • Significant loss of existing GI within short term

ID7 - Greenways and Public Rights of Way

Plan Objectives: D11, D12, N2.

  • Protection of Greenways and PROW's
  • No loss of Greenways and PROW's

Delivery

Local Plan

Monitoring

  • AMR
  • Significant loss of Local Greenways within short term

ID8 - Chesterfield Canal

Plan Objectives: D11, N2.

  • Protection of the original route of the Chesterfield Canal and preferred alternative route through Killamarsh
  • No loss of the existing Chesterfield Canal and the preferred alternative route

Delivery

Local Plan

Monitoring

  • AMR
  • Significant loss of the existing Chesterfield Canal and the preferred alternative route within short term

ID9 - Open Space, Sports and Recreation Facilities

Plan Objectives: D4, D11, D13.

  • Protection of existing open space, sports and recreation facilities
  • Open space local standard/ recreation survey report
  • Playing Pitch Strategy/ Indoors Sports Strategy
  • No loss of existing facilities, unless in line with policy Improvement to quality of existing open space, sports and recreation facilities
  • Amount of new open space, sports and recreation facilities that are completed

Delivery

Local Plan

Playing pitch Strategy

GI Strategy

Monitoring

  • AMR
  • Significant loss of existing open space, sports and recreation facilities within short term
  • No improvements of quality within 5 years of adoption
  • Despite new provision below local standard/ quantitative deficit remains within 5 years from adoption (except for 'outdoor youth facilities')
If you are having trouble using the system, please try our help guide.
back to top back to top